Monday, May 6, 2019
U05a1 Case Analysis Study Example | Topics and Well Written Essays - 1000 words
U05a1 epitome - Case Study ExampleAs early as in 1985, the possibility of a outstanding disaster in case of an explosion inside the tunnel was pointed out by The Baltimore Sun. However, aught was done to ensure safety in case of such a disaster. The citys 440 rapscallion indispensability plan contained no provision to meet such an eventuality. The event On 18 July 2001, a freight train of CSX that was carrying various items from paper, plywood, soy oil, and many chemicals derailed inside the tunnel. As a result of derailing, in that respect was raise and smoke. The crew of the train could not contact authorities and hence, they uncoupled the first three locomotives and drove out of the tunnel. Soon, thick smoke started covering the city. The fire department was getting calls from different parts of the city reporting smoke. The waybill from the train crew revealed that the train carried hazardous materials like hydrochloric acid, flurocilicic acid, tripopylene, glacial aceti c acid, ethyl radical hexyl phthalate, and propylene glycol. While some of these were combustible, others could create breathing problems and skin burns. A possibility of boiling fluidness expanding vapor explosion (BLEVE) could not be ruled out, which could mean total destruction of the city. In addition, the fire officials were not at all familiar with handling those chemicals. As it is rightly said in Penuel, Statler, and Golson (2011, p.89), decisions during a crisis are to be taken in an environment where issues are wrongly defined and data is erroneous. The forethought of the situation It seems that the fire department proceeded well in accordance with the stipulated procedures. As the citys emergency plan did not provide any guidelines, it was for the first responder- the fire department- to take the lead. As per the stipulated incident dictation procedure, the senior officer of the first unit on the scene is responsible to assess the situation, and, depending on the earn estness of the situation, to report upwards. Exactly in the same way, the matter was reported to Chief Heinbuch, and soon he started the demand post near the north end of the tunnel. This step too seems well in accordance with the suggested procedures in case of an emergency. Soon, Heinbuch took charge of the situation, and set up the require post near the north end of the tunnel. At this juncture, it is worth remembering that this step too is well in accordance with the stipulation that an incident command post will be sacrificeed within close proximity to incident response operations. (Penuel et al., 2011, p. 89). The bordering positive point to note from the case is the cooperation between the fire department and the Maryland Department of environment (MDE). According to the reports, both the departments worked and trained together, and hence, communication and cooperation were instantaneous. It seems that there was an averagely effective management of the situation. It seem s that the team was able to establish link with a number of other groups ranging from MDE, public health, public works department, and the department of transportation, US slide Guard, the EPA, and the National Transportation Safety Board. Still, there was serious lack of communication among groups that could lead to loss of lives. An prototype is the effort by DPW crews on 19 July to excavate the water
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.